Top Tips |
Scenario: I would like a more concise list of production jobs in APS. Currently I see all jobs irrespective of their start date vs my planning interval as well as seeing on hold jobs that should not be scheduled. Can I manage these based on dates and/or status? Solution(s): You can manage what jobs are visible in APS based on various criteria.
You can also manage MRP Imports and rules within the Materials Planning settings. |