Top Tips

Completed operations will still be visible in the production jobs pane irrespective of this setting until the Job itself is completed. The Operation indicator will change to yellow to indicate that no scheduling is required.

Problem:

As soon as operations are complete they disappear from the planning board, I'd still like visibility of them. 
 

Cause(s):

  • A scheduled operation has been completed and is subsequently removed from the planning board - The setting causing these operations to disappear, can be managed depending on your needs.

Solution(s):

  • Change this behavior in APS settings using the following steps

1. Open APS Settings

2. Select Scheduling & Routing rules

3. Select the Routing Tab

4. Check or uncheck Hide completed operations accordingly

5. Select Save


 

 