Views:

Operating Hours
The total number of shift hours for the selected resources within the time period

 

Scheduled Hours
The total number of planned productive hours for the selected resources within the time period.

 

No Shift Hours
The total hours lost as a result of having no shift within the selected time period

 

No Shift Loss
The total hours lost as a result of having no shift within the selected time period (shown as a percentage)

 

Planned Downtime
The total planned downtime hours within the selected time period.  Operating hours - scheduled hours where scheduled hours are productive (uptime) hours.

 

Downtime
The ratio shown as a percentage of the planned downtime compared with planned operating time.

The Loading Report provides detailed analysis of the loading position of resources with comparisons to last month and/or quarter to understand trends. Use this to compare your planned uptime with all the time available (calendar time) to gain insight of asset utilisation to support capital expenditure and other management decisions.

 


To open Loading:

 
  1. Select Loading in Performance Analysis

 

 

Related Articles (1)