Top Tips |
Problem: I have a new work unit that needs the same shift applied as our current resources. These resources however show as having shift 'Not set' this shift does not exist, yet there is a defined shift pattern showing on the graphical planning board. How can I fix this? Cause(s):
Solution(s):
See related articles for further information on shifts.
|