Visual APS will automatically calculate the time difference between the original job order start and due date (as specified against a job) and the start and due date and time when scheduled. There are 4 columns in the task panel that represent this information. These columns apply to both the job and operation grid views.
Each time a job order or operation is scheduled, these fields are automatically updated.
To reset changes for a job order
To reset changes for all job orders
|