LYNQ Term
|
Sage X3 Term
|
Definition
|
Supported in LYNQ
|
|
|
Employee
|
Employee
|
A type of resource used for data collection purposes (OLE)
|
Yes
|
|
Equipment
|
Equipment
|
A type of resource used for data collection purposes (OEE)
|
Yes
|
|
Final Operation
|
Not Applicable
|
The last operation defined in a product routing
|
Yes
|
|
Job Order
|
Work Order
|
A type of order for manufacturing products
|
Yes
|
|
Job Receipt
|
Production Reporting
|
A type of function that is used for reporting manufactured quantity
|
Yes
|
|
Location
|
Location
|
A storage location that is used for receipting finished goods or issuing materials
|
Yes
|
|
Materials
|
Materials
|
Materials used to manufacture a product
|
Yes
|
|
Milestone Operation
|
Not Applicable
|
A special type of operation within a routing that allows back flushing of labour and materials
|
No
|
|
Move Time
|
Not Applicable
|
The time it takes for an operation to move to the next operation in the routing
|
No
|
|
Operation
|
Operation
|
A series of steps that are completed to successfully product a product
|
Yes
|
|
Outside Operation
|
Outside Operation
|
An operation that is completed outside the company's manufacturing facility
|
Yes
|
|
Planner
|
Buyer/Planner
|
The person who is responsible for planning and scheduling production
|
Yes
|
|
Primary Resource
|
Employee & Equipment
|
Employee and work units
|
Yes
|
|
Product
|
Product
|
The finished good to manufacture
|
Yes
|
|
Product Class
|
Product Line
|
Group or classification of a product
|
Yes
|
|
Queue Time
|
Not Applicable
|
The period of time during which the product awaits transfer to the next operation in the routing
|
No
|
|
Related Jobs
|
Linked Work Order
|
Parent Job Orders and Child Job Orders required to manufacture a product
|
Yes
|
|
Run Time
|
Run Time
|
The time it takes for an operation to move to the next operation in the routing
|
Yes
|
|
Scrap
|
Scrap
|
Discarded or rejected operation
|
Yes
|
|
Secondary Constraint
|
Tools
|
Additional constraint outside the basic primary constraints, including tooling, skillsets etc
|
Yes
|
|
Setup
|
Setup Time
|
The time it takes to prepare the manufacturing work unit for production
|
Yes
|
|
Startup Time
|
Not Applicable
|
The time it takes for a work unit to reach stable performance and quality conditions
|
No
|
|
Task/Activity
|
Task Activity
|
A concatenated code that defines the job, operation and activity (runtime, setup, teardown)
|
Yes
|
|
Teardown Time
|
Post Operational Time
|
The time it takes to remove the setup from a work unit before setting up the next job order
|
Yes
|
|
Work Centre
|
Site
|
A process cell, production unit, production line or other area used in the manufacture of a product
|
Yes
|
|
Work Unit
|
Work Centre
|
The equipment element within the work centre
|
Yes
|
|